Looking for a pro to remove a load-bearing wall in Clear Lake Shores, TX? Describe your project once and up to three licensed contractors and engineers who work in Clear Lake Shores and Galveston County get back to you with a quote. It's free and there is no obligation.
Clear Lake Shores is home to about 1,294 people (2024 Census Bureau estimate), a growing community (+1.3% since 2020). With 2,976 people per sq mi, it is a suburban area. Opening kitchens and living rooms is one of the most requested remodels in homes built before open floor plans became the norm.
Clear Lake Shores at a glance
- Population (Census Bureau estimate, 2024)
- 1,294 (+1.3% since 2020)
- Rank in Texas
- 738th of 1,224 cities and towns
- Land area
- 0.4 sq mi
- Population density
- 2,976 people per sq mi (suburban)
- Type
- City (Clear Lake Shores city)
- Main county
- Galveston County
What to check before hiring in Clear Lake Shores
- Permit: in Texas, removing a load-bearing wall requires a building permit and an inspection.
- Engineering: many building departments ask for a stamped beam calculation; your contractor can coordinate it.
- Hidden extras: wiring, plumbing or ducts in the wall, and floor and ceiling repairs.
- Price drivers: span, loads above, beam type (wood, LVL or steel) and finishing.
Useful official resources
-
NCEES: state licensing boards
Find your state board to check an engineer's license.
-
ICC: International Code Council
Publisher of the building codes most states and cities adopt.
Services available in Clear Lake Shores
-
Load-bearing wall removal with beam
Removal of the wall with temporary shoring, a new beam and posts, the permit and the finishing.
-
Engineer's beam calculation
Visit and stamped beam and post calculation by a licensed engineer, for the permit and the contractor.
Frequently asked questions in Clear Lake Shores
How much does it cost to remove a load-bearing wall in Clear Lake Shores, TX?
It depends on the span, the loads, the beam and the finishing. Describe your wall: pros who serve Clear Lake Shores reply with a quote.
How long does it take?
The structural work often takes a few days; permits and finishing add time.
Do I need an engineer?
Often yes, especially for long spans or several floors above. Some building departments accept code tables for simple cases.
Which licensed contractors and engineers will contact me?
Up to three independent licensed contractors and engineers who serve Clear Lake Shores and the surrounding area, chosen for the service you need. Your details are shared only with your consent.
Source: U.S. Census Bureau, Population Estimates Program (Vintage 2024) and Gazetteer Files (public domain), imported on 10/31/2026. Figures describe the incorporated place or county as published; they are shown for information only.